Abstract

Ji, C. and Wu, H., 2019. Medium and long term optimal scheduling of cascade hydropower stations based on topological parallel computing. In: Guido-Aldana, P.A. and Mulahasan, S. (eds.), Advances in Water Resources and Exploration. Journal of Coastal Research, Special Issue No. 93, pp. 572–577. Coconut Creek (Florida), ISSN 0749-0208.

In order to shorten the calculating time effectively for solving the medium-and-long term optimal scheduling model of cascade hydropower stations, based on the decomposition and coordination method of large-scale system, topological parallel computing is proposed in this paper. Then, taking the cascade hydropower station system located in one watershed of Southwest China as an example, the decomposition and coordination topology parallel computing method is validated in its medium-and-long term optimal scheduling of power generation. It provides a new research direction for improving the calculating efficiency of the optimal scheduling model of giant hydropower stations, the purpose of which is to make full use of water resources.

©Coastal Education and Research Foundation, Inc. 2019
Changming Ji and Hao Wu "Medium and Long Term Optimal Scheduling of Cascade Hydropower Stations Based on Topological Parallel Computing," Journal of Coastal Research 93(sp1), 572-577, (23 September 2019). https://doi.org/10.2112/SI93-076.1
Received: 16 May 2018; Accepted: 26 April 2019; Published: 23 September 2019
KEYWORDS
Cascade hydropower stations
dynamic programming
large system decomposition and coordination
topology parallel computing
use of water resources
RIGHTS & PERMISSIONS